Main stages of repair in the apartment

Main phases of repair in the apartment.

How to start repair of the apartment?

The very first phase of the repair of old apartments is the damage and taking apart first off of the dilapidated walls and More help partition walls, getting rid of the wall and ceiling finish. This phase is among the most "unclean" stages of the repair work.

One more among the most important and "dirty" works is the window block replacement. It is necessary to do this first off due to the fact that dirt and dust will be unallowable throughout following phases and it is forbidden at all to open windows throughout painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is essential to load them immediately in polyethylene read these plumbing tips movie and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following phase is circuitry. Circuitry can be installed in walls or along the floor. Wiring is made inside the pipes to make sure electrical safety and increase reliability. The pipe protects electrical wiring from external damages and enables to replace the wire entirely without breaking walls and flooring just by inserting the brand-new wire instead of the old one.

House Painting follows the circuitry. The frequent mistake during the synchronised conducting of such works occurs when workers forget to lay out one of the cable televisions and house painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are essential to seal chases on the completed wall. The locations of the feed switch and wall outlet place and their number must be thought-out beforehand. The plan of power wiring is normally included into the style project.

Later on the system should be ready to service in case of failures. In addition to the electrical wirings, the telephone cable television and the TV cable are set out. The power cable must not be laid out near the telephone and antenna cable televisions to avoid sound pickup and disturbance. The most strange minute is setting out the television cable. In order to make two (or 3) television set in the house the second cable is often simply "securely soldered" in parallel, so the cable television resistance is reduced. As an outcome, the display screen quality is deteriorated, many programs can't be gotten and etc. In order to prevent such circumstance it is needed to welcome a specialist with special devices. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted simultaneously in all properties, if it is possible. Delays are linked with the technology. Each applied layer of the plaster (or filling out ending up) should dry entirely before the work will continue.

Works in hygienic arrangements and the kitchen begin concurrently with house painting. It is better to satisfy so-called "dirty" operate in the first place and concurrently. In accordance with the strategy of the hygienic technician location welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then works in hygienic arrangements are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and accessories are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed throughout this phase in order to conserve their surface area look. The surface puttying of walls is performed simultaneously. The highly specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.

The following stage is the procedure of fill. Fill can be made with different materials-- from usual masonry cement-sand mix to self-aligning floorings. The benefit of the easy mix is its cheapness, the drawback is that such mixture is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next phase of the work with flooring can be conducted, i.e. the period is too long. Self-leveling self-aligning floors are a lot more expensive, but more technological. Aligning takes place nearly "immediately" i.e. fluid option of mixture is put out, then it runs and you get the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill innovation) is utilized bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Setup of doors must take into the account thickness of future floor covering. After installation the door can be removed its hinges and removed up until completion of repair work or packed into polyethylene movie to safeguard from damages. Concurrently ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile should be laid on the absolutely dry overlay.

Finishing of the floor installing depends upon the planned covering. In most cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In premises where surface covering of the floor is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out consequence is linked only with such scrambling procedure when the excellent amount of dust is created. In spite of the reality that great floor grinders are geared up with the vacuum, the adequate amount of dust is sped up on surrounding subjects including walls. Dust is really acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be finished. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is needed to keep in mind that the sequence of works was listed in basic and can alter depending upon the certain situation-- the number of spaces in facility, your resources, peculiarities of the construction of the multilevel premises. It is based on common sense and everyone capable of analysis can individually produce such a series.